MPPI's exploration covariance is also its feedback gain: too little exploration destabilizes an inverted pendulum
In model predictive path integral (MPPI) control with a warm start, the exploration covariance sets not only how widely candidates are sampled but also the closed-loop feedback gain. For linear quadratic problems with infinitely many samples, too little exploration makes MPPI nearly repeat the previous solution and fail to stabilize an exponentially unstable plant, while the same covariance lowers the effective sample size, a structural conflict between stability and sample efficiency. Stabilizing Subspace MPPI (SS-MPPI) computes the directions needed for stabilization and samples only the rest, staying stable with small exploration and few samples in inverted-pendulum and quadruped simulations.